Projects
Wybrane projekty SufmarTECH z kategorii Impact-resistant systems
Poznaj naszą ofertę: Impact-resistant systems
- 2026
Szczeciński Dom Sportu
A sports and recreation complex in Szczecin comprising a multi-purpose arena, a covered swimming pool with a 30 m pool, and martial arts halls. Our scope included acoustic suspended ceilings and wall claddings in the pool hall and the multi-purpose arena.

- 2023
Sports Hall at the Youth Educational Centre (Młodzieżowy Ośrodek Wychowawczy) in Babimost
Sports hall of the Młodzieżowy Ośrodek Wychowawczy in Babimost: ball-impact-resistant ceilings, acoustic Ecophon wall claddings and a full acoustic adaptation — from the acoustic design to post-installation measurements.

- 2022
Sports Hall at the Primary School in Kwilcz
Sports Hall at the Primary School in Kwilcz, a hall measuring 36 × 18 × 8 m serving pupils and the local community. In 2022, after the building was flooded, we installed new acoustic wall linings and restored the interior surfaces.

- 2018
Sports hall at the primary school in Kostrzyn
The sports hall at the Szkoła Podstawowa nr 1 im. Ewarysta Estkowskiego in Kostrzyn, at ul. Piasta 1, was built to meet the needs of a school that previously had no suitable facility for physical education classes. The building comprises a full-size sports hall, a spectator stand and a support area with six changing rooms.

- 2014
Warm-Up Hall Next to the Łuczniczka Multi-Purpose Arena in Bydgoszcz
The training hall at the Łuczniczka complex in Bydgoszcz is a modern sports facility designed for intensive use and top-level training. As part of the project, we implemented comprehensive ceiling and acoustic solutions, combining mechanical resistance with improved acoustic performance across the large space.

