Project · 2018
Central Sports Centre in Zakopane
- Completion date
- 2018
- General contractor
- Centralny Ośrodek Sportu – Ośrodek Przygotowań Olimpijskich w Zakopanem
The subject of the contract was the supply and installation of ceiling panels for the sports swimming pool at the Central Sports Centre – Olympic Preparation Centre in Zakopane. The contracting authority was the Central Sports Centre in Warsaw, and the procedure was conducted as an open tender in 2017. The scope of works concerned the existing sports swimming pool used as part of the infrastructure of the Olympic Preparation Centre in Zakopane.
A sports swimming pool is a space with demanding operating conditions, above all due to the elevated humidity and the specific microclimate found in the immediate vicinity of the pool basin. The ceiling solutions used had to be adapted to these conditions, and carrying out the works required particular care when removing and reinstalling the elements located above the basin.
We carried out the removal of the existing suspended ceilings above the pool basin and their reinstallation. The scope of works included the precise dismantling of the existing ceiling system, safeguarding the elements intended for reuse, and reinstalling them while preserving the geometry and correct layout of the entire ceiling surface.
The greatest challenge was organising the works directly above the pool basin and the need to safely remove and reinstall the ceiling elements in a demanding environment with elevated humidity. Precise execution of the works made it possible to preserve the existing ceiling layout and restore its full functionality, without altering the character and geometry of the pool interior.