Project · 2011
Termy Maltańskie
- Completion date
- 2011
- General contractor
- ALSTAL Grupa Budowlana
Termy Maltańskie at ul. Termalna 1 in Poznań is a multi-purpose sports and recreation complex comprising, among other facilities, Olympic sports pools, an aquapark, a recreation zone and service facilities. The building has an area of around 41,300 m², a volume of 253,659 m³, and was built between 2008 and 2011. The client was Termy Maltańskie Sp. z o.o., the general contractor was ALSTAL Grupa Budowlana, and the architectural design was the responsibility of the ATJ Architekci studio.
The specific nature of the pool complex required solutions adapted to large spaces, elevated humidity and intensive use of the building. Particular importance was placed on the durability and stability of the installed elements, the acoustic properties of the ceilings, and the precise fit of the claddings to the complex geometry of the hall and its technical infrastructure.
For the general contractor, ALSTAL Grupa Budowlana, we carried out a broad scope of works comprising the supply and installation of structural elements, claddings for balconies and supply-air ducts, wall claddings in the sports hall, and ceiling claddings on the balcony soffits. The scope also included the supply and installation of acoustic suspended ceilings, which required precise structural execution and proper coordination with the building's other installations.
The greatest challenge was carrying out a multi-trade scope of works across the extensive spaces of the sports hall, including installing elements at great heights using tall scaffolding systems and coordinating the works with the technical installations. The use of appropriately selected structures and installation techniques achieved durable, precisely fitted claddings and functional acoustic ceilings, creating a consistent and aesthetic finish for this demanding pool facility.