
Project · 2015
Radzim Gaudenty Church in Gniezno
- Completion date
- 2015
The scope of works included preparing the acoustic design together with its execution. The works were carried out at a height of 12 to 18 metres above the floor — the Ecophon Master panel ceiling was set 4 cm away from the plasterboard ceiling to improve the acoustic parameters.
