
Project · 2015
Ceiling demolition at AWF Poznań
- Completion date
- 2015
Ceiling demolition at the AWF Poznań swimming pool. Within two days, a specialist scaffolding structure 12 m high was erected, the pool hall floor was protected with foil and matting, and the pool basin itself was secured, avoiding the need for a costly water change. The works were supervised by a specialist diver, and all demolition material was disposed of.
