How much absorption material does a gym hall need

A complete calculation for a typical 24 × 12 × 7 m hall: the standard allows 1.5 s of reverberation, which requires about 216 m² of absorption. How many square metres of ceiling and wall that means — and why it pays to leave a margin.

For school head teachers, local authorities and designers who want to know how much material to order, before they order it.

Step 1: target and required absorption

Step 2: how much is missing, and how many metres of material that is

24 × 12 × 7 m hall — calculation using the Sabine formula, T = 0.161 × V / A
QuantityCalculationResult
Volume V24 × 12 × 72016 m³
Required absorption0,161 × 2016 / 1,5≈ 216 m²
Absorption at T = 5 s0,161 × 2016 / 5≈ 65 m²
Missing absorption216 − 65≈ 151 m²
Minimum material at α = 0.90151 / 0,9≈ 168 m²

Przewiń w poziomie, aby zobaczyć wszystkie kolumny

Step 3: ceiling and walls, not the ceiling alone

Najczęściej zadawane pytania

  • Is the Sabine formula enough for a design?
  • Where do you get the reverberation time “before”?
  • What if the hall is larger than 5000 m³?